The initial formation pressure should be retained in deformed media reservoir development in order to obtain a higher recovery.
变形介质油藏的开发应以保持原始地层压力为前提,这样,才能得到较高的采收率。
The time when the cement slurry's column pressure reduces to the water column pressure before or after initial set is directly related to whether or not formation fluids flow out during wait-on-time.
水泥浆的有效浆柱压力是在初凝前还是在初凝后降低至水柱压力,直接关系到能不能在固井候凝过程中压稳地层流体、实现压稳防窜候凝。
Several beeline analysis methods for determining formation flow capacity, skin factor and initial reservoir pressure from slug-test data are reviewed.
综合研究了几种可以用于确定地层系数、表皮因子和原始地层压力的段塞流直线分析方法。
应用推荐